- PMU TG. LANGSAT 132/11KV Complete Installation of 2 X 30Mva Power Transformer.
- C/W Oil Filtration & Oil Testing and Earthling works. Inclusive Supply of Materials Copper Tape Copper Rod and etc.
- PMU BANDAR BARU NILAI 132/11KV. Complete Installation Of 30Mva Power Transformer.
2020
- MTM – Contract tender of oil filtration within Peninsular and East Malaysia
- LOTTE CHEMICAL TITAN (M) SDN BHD
1. TANJUNG LANGSAT INDUSTRIA:
Transformer maintenance servicing, testing, oil change/ purification, and gasket replacement from COGEN 2 Plant.
2. PASIR GUDANG:
a) PE1-Maintenance and servicing of transformer
b) PE2- Transformer maintenance servicing, testing, oil change/ purification, and gasket replacement
- AUCONPRO ENGINEERING SDN BHD – PMU TANAH MERH, KELANTAN
Substation work isolators c/w earthing and clamp and conductors works - KNIGHT FRANK MALAYSIA – Installation of fire alarm signal cable for exhaust fan panel and fire damper for existing exhaust fan
- HASIL WAN (M) SDN BHD – Supply and erection of shunt reactor for TNB
- KAPAR ENERGY VENTURES SDN BHD – Transformer leak rectification on unit transformer
2019
- TERACHI ELECTRICAL SERVICES SDN BHD – Transformer testing at BES DSC Bangsar 50 MVA transformer 33kV
- ABB MALAYSIA SDN BHD – Transformers’ rectification works PG8 and PG 2-Substation 33/11kV
- ETD MAKMUR SDN BHD – Establishment of PMU 275kV
- PESTECH TECHNOLOGY SDN BHD – Electrical works for the supply, design, install, testing and commissioning of new control system, turbine governor system and auxiliaries at Sg Piah Lower TNB Hydro Power Stations
2018
ABB MALAYSIA SDN BHD – Preventive maintenance work at NXP Semiconductor, Petaling Jaya
UiTM Pahang – Proposed large scale photovoltaic system 50MVAec for UiTM Solar Power Sdn Bhd at Lot PT 10968 (HSD 444020, Gambang, Mukim Kuala Kuantan, Pahang – PMU 132-33kV MEC City-Gambang, Pahang
2017
- ABB MALAYSIA SDN BHD – 1 x 90 MVA ABB transformer dismantling at PMU Butterworth North and installation after repair at TNB Stores Bukit Sentosa Rawang
- KUB POWER SDN BHD – 2×90 MVA 132/33 KV transformer bay upgrading works and dismantling and packing erection installation conversion from 132/22 k 2×60 MVA to 132/22 KV 2×90 MVA at PMU New Tasek
- LOTTE CHEMICAL TITAN (M) SDN BHD – NC1 Parallel transformer operation – 11.5/14 MVA 22/6.6 KV brush transformer erection, testing and commissioning
2016
- MARA – Supply, install, testing, certified training equipment and upgrading works at KKTM Lenggong
- TECHNOFIT SDN BHD – Provision for transformer oil processing 2 X 90 MVA CGL transformer at PMU Tasek
- ABB MALAYSIA SDN BHD – Transformer sample oil test (SEH Hulu Klang)
2015
- OROSKO TRADING SDN BHD – To take oil samples new final sample for testing at TNBR transformer oil replacement process for 2 X 45MVA Daihen Electric at PMU Slim River
- KAPAR ENERGY VENTURES SDN BHD – 310MVA 275/20KV step up transformer rectification of leaks at main tank and cooler
- REINHAUSSENCE ASIA PACIFIC SDN BHD – Dismantling of EXISTING OLTC and reinstallation of original MR OLTC complete assembly for 90 MVA 132/33 KV transformer (SSPK Cheras)
2012
- KT SYSTEM PROTECTION S/B
- PMU OLAK LAMPIT 240MVA TX OIL SAMPLING AND TESTING AT TNBR: FURAN & DGA TESTING
- FILTRATION OF TRANSFORMER AT TITAN JOHORE CHEMICAL PLANT. RENTAL OF FILTRATION PLANTS, VACUUM PLANT AND EQUIPMENTS
2009
2008
- Repair of leak at OLTC Flange for Toshibe Unit Transformer NO1C Paka Power Station.
- Replacement of 275KV HV Bushing and 3 sets of Neutral and 3Nos Current Transformers. 240MVA/132/33KV Auto Transformer PMU Connaught Bridge.
- Leak repair and Airbag Normalization works. 48.2 MVA /11/132KV Generator Transformer Teluk EWA Power Station Langkawi
2007
- Drain LV Chambers Oil and dismantling of LV Bushings links for Station Transformer 1C 130MVA/10.5/132KV Connaught Bridge Power Station.
- Installation of Cable Supports Modification of HV Cable Box and Installation of Earthing Tape 15MVA /33/11KV TAKOAKA Transformer PPU Ulu Klang.
- Installation of Cable Supports Modification of HV Cable Box and Installation of Earthing Tape 15MVA /33/11KV TAKOAKA Transformer PPU Ulu Klang.
2006
- Major Service of 8.5 MVA /15/ 6.9KV HYOSUNG Unit Transformerr NO 4C. Paka Power Station.
- Dismantling And Installation of 3 Units of HV Bushings and Turrets. Vacuuming and Filtration Works For 240mva/ 275/132/33 KV Hyundai Station Generator Transformers SGT 1 PMU Connaught Bridge Power Station.
- OLTC Service & Maintenance works – 2 NO of 12 5MVA/ 22/11KV Xian Transformers PPU Slim River Perak.
2005
- Installation of Airbag Generator Transformers NO 2 Serdang Power Station
- Installation of Airbag Generator Transformers NO2A AND GA2B Paka Power Station Terengganu
- Dismantling Transportation and Installation of Airbag Generator Transformers NO22 Serdang Power Station
2004
- Major Refurbishments Servicing and Installation works for 2 Units OF 90MVA 132/33KV ABB Transformers.
- Major Refurbishments, Servicing and Installation works for 2 Units OF 30MVA 132/11KV ABB Transformers.
- PMU Batu Arang, Dismantling Preservation and Packing and Transportation 2 units of 90MVA /132/33kvABB Transformers From PMU Batu Arang To PMU Bangi Heights